EN     中文

Copyright © Shenzhen Shennanyi Glass Product Co.,Ltd 粤ICP备11048482号  Powered by:www.300.cn

卡塔尔地铁站综合项目

浏览量
【摘要】:
Metro Station Glodenline All Shelter/Metro Station Greenline Underground All Shelter/Metro Station Glodenline Underground All Shelter/Green Line Al Riffa Station/Redline ……
 
Metro Station Glodenline All Shelter
Metro Station Greenline Underground All Shelter
Metro Station Glodenline Underground All Shelter
Green Line Al Riffa Station
Redline Qatar Lusail Station
Redline Qatar University Station
共计6个独立车站
 
 
 
总面积超过3万平方米
 
 
 
6mm 白玻彩釉+1.52mm PVB+6mm Low-E+20AR+6mm 白玻+1.52mm PVB+6mm 白玻(多层半钢化夹层中空玻璃)
6mm 白玻彩釉+1.52mm PVB+6mm Low-E+20AR+6mm 白玻+1.52mm PVB+6mm 白玻彩釉(多层半钢化夹层中空玻璃)
8mm 白玻彩釉+1.52mm PVB+8mm Low-E+20AR+8mm 白玻+1.52mm PVB+8mm 白玻(多层半钢化夹层中空玻璃)
8mm 白玻彩釉+1.52mm PVB+8mm Low-E+20AR+8mm 白玻+1.52mm PVB+10mm 白玻(多层半钢化夹层中空玻璃)
8mm 白玻彩釉+1.52mm PVB+8mm Low-E+20AR+8mm 白玻+1.52mm PVB+12mm 白玻(多层半钢化夹层中空玻璃)
下一篇: